Landscaping wood plastic composite trolley
- Model
- wpc flower pot trolley
Item specifics
- Material
- Natural fiber + HDPE + Additives
- Shape
- Square/round
- Type
- Pot trolley
- Surface
- sanding
- Package
- 6 pcs/ctn
- OEM available
- YES
- Size
- 300*300*70 mm
- Load bearing capacity
- 60-70 kg
Review
Description
70kg loading WPC dolley caddy Composite wood
Square type:(customized design accepted)
Round type:
1. Model: TY-2
2. Eight color available: Cedar/Copper Brown/Wood/Sandalwood/
Coffee/Grey/Dark Grey/Mocha
3. Measurement: 300*300*70 mm
4. Surface treatment: Grooved+Embossing/Sanding/Sliding
5. OEM is welcome. If you have you own products, Please send your sample for our reference.
Introduction of WPC
Ingredient of wood plastic composite:
= Bio fiber (Professionally treated dry bamboo/wood fiber)
= HDPE (Grade A Recycled HDPE)
= chemical additives (Anti-UV agent, Anti-oxidation agent, stabilizers, colorants, etc. )
DETAILS:
Color and surface:
Our factory:
Brand Name: | HOH Ecotech |
Year of establish: | 2007 |
Certification: | ISO9001:2008/ISO14001/ASTM/CE/ROHS/SGS/FSC/BSCI/REACH |
R&D staff: | 10 |
Extrusion Lines: | 63 lines |
Factory Scale: | 20,000 square meter |
Shipping Volume: | >120 containers / month |
Main Market: | Europe,Oceanic,North & South America |
OEM service: | YES Available |
Production Capacity: | 2000tons/month |
FAQS:
Q1.How can I get quotations??
A: Pls kindly provide the Product size (width*thickness*length) & approximate quantity
so that you can get a more exact price.
Q2.Do you have MOQ limite ?
A: We basically accept customers' requests and will try our best to save cost for you, so there's NO MOQ Limite !
Q3.How about the payment terms?
A: We'd like to do T/T with deposite in advance,but L/C is also acceptable.
Q4.Can I get samples to confirm the color and quality?
A: Definitely you can! Samples are always free, but the freight should be at your cost .
Q5.Can I have my own design package?
A: Yes, we're professional ISO factory and accept OEM !
Q6: What's the Lead time?
A: Usually speaking, 15-20 days for 1*20GP